Page 102 - Yucaipa Sustainable Groundwater Management Agency - Yucaipa SGMA
P. 102

Ronald Schnabel, PG, CHG





            Ronald Schnabel is a senior hydrogeologist with 39 years’
            experience in geology and hydrogeology. Mr. Schnabel has used his
            thorough understanding of geology and hydrogeology to help clients
            requiring planning, permitting, design, and operational expertise
            with water banking and artificial groundwater recharge. He has
            served as project manager and key team member on more than
            twenty groundwater banking and recharge projects in California and
            for numerous other types of projects. Mr. Schnabel’s regulatory
            experience includes environmental permitting, plans of operation,
            California Environmental Quality Act, environmental impact reports
            (EIRs), and National Environmental Policy Act compliance and                Ronald Schnabel
            permitting. He aims to use his experience to further help clients   Education
            needing surface water- and groundwater-related investigations,      California State University,
            artificial recharge projects for aquifer storage and recovery, well   Sacramento
            design, construction and testing. Mr. Schnabel’s experience         BS, Geology
            includes groundwater modeling, Geographic Information Systems,      Certifications
            statistics, surface water-measurement methods, and geophysics.
                                                                                Professional Geologist (PG), AZ
            Project Experience                                                  No. 39745; CA No. 7836
                                                                                Certified Hydrogeologist (CHG)
            Centennial Hydrogeologic Investigation, Centennial Founders         CA No. 867; OR No. 2020; WA
            LLC, Los Angeles, California. Conducted a hydrogeologic study to    No. 463
            assess the quantity and quality of groundwater. Performed
            preliminary design and cost estimating for groundwater recharge and recovery facilities consisting of
            approximately 100 acres of spreading grounds and seven recovery wells. Conducted an extensive
            hydrogeologic study that included drilling and installing eight monitoring wells, designing and
            constructing a groundwater recharge test basin, and estimating the safe groundwater yield for local
            groundwater supply. This investigation was a portion of the water resource assessment study for a
            major planned community.

            Develop and Prepare GSPs for Multiple Basins, Fox Canyon Groundwater Agency, Ventura County,
            California. Project manager and senior hydrogeologist developing GSPs for the FCGMA. The GSPs include
            the high prioritized basins of Pleasant Valley, and Las Posas, and the Oxnard Subbasin, and the medium
            prioritized basin of Arroyo Santa Rosa. Duties include collaboration with the Agency, the Technical
            Advisory Group, Charter Water Allocation Groups, stakeholders, and the public in order to produce
            technically proficient and adaptive GSPs. The GSP development addresses developing equitable methods
            for controlling groundwater extractions and reaching agreement on how these controls are accomplished
            and implemented.











                                                                                                          Page 1
                              Yucaipa Sustainable Groundwater Management Agency - August 9, 2018 - Page 100 of 208
   97   98   99   100   101   102   103   104   105   106   107